See Blog for more Chesapeake details


Challenge:  

• Several Large and difficult-to-manage databases.
• Long Back-up Times.
• Long Crawl Times.

Client Requirements:   • Reduction in the Content Database Size (min. 75%).
• No impact on any SharePoint Functionality.
(Must meet dozens of use-case scenarios)
• No impact on the End User Experience.
• No Measurable impact to System Performance.
Results
Before After DIfference
"StoragePoint reduced our largest database by over 98% as well as alleviated several challenges in our growing environment.

With Storagepoint, we can now leverage our SharePoint investment on a much larger scale."

Mark Wiley
Chesapeake Energy IT Manager
  Content Database Size 149Gb 2.61Gb 98.1% Smaller  
  SharePoint Functionality Passed 100% Passed 100% None  
  End-User Experience
(Many Use-case scenarios)
Passed 100% Passed 100% None  
  Large File Uploads
(10-50 Mb)
Several Minutes Few Minutes Significantly
Faster
 
Index Crawl (Full) Over 24 hours

Under 5 Hours

Significantly
Faster
 
Copyright 2009 BlueThread Technologies, Inc.